The main advantages of generator load bank detection
One of the main advantages of generator load detection is the ability to perform preventive maintenance. By continuously monitoring the load on the generator, technicians can detect any potential problems or failures in time, so that the necessary precautions can be taken to prevent a major failure of the generator.17 2023-11 -
Generator detection false load detection method
Generator false load detection is an important method for testing generator performance and reliability. By using dummy loads, the operation of the generator under actual load conditions can be simulated, resulting in a more accurate assessment of the performance and reliability of the generator. This paper will introduce the detection method of generator false load detection, including preparation stage, test stage and result analysis stage.14 2023-11 -
Dc power supply, AC power supply and other products how to choose the right radiator
In the work, it is necessary to consider the radiator selection of AC power amplifier. The power amplifier used has a very large capacity, with a current of 40A and a power of 400W.10 2023-11 -
Test of rated on-off capability of programmable DC power supply
Programmable DC power supply has the advantages of low voltage and large current, not only in the range of 0-10V, the maximum current up to 50kA, instantaneous current rise time is less than 5ms, less than 2ms, less than 1ms optional, very suitable for a variety of low voltage electrical testing requirements.07 2023-11 -
Programmable AC power step programming function
With the rapid development of power electronics, product development has higher requirements for programmable AC power supply, that is, programmable AC power supply with high precision, programmable, wide range and other advantages.02 2023-11 -
Application of high power electronic load to DC charging pile test
With the continuous development of electric vehicles, the demand for charging piles is increasing. In the past, the actual environment test method was usually used for the charging pile test. Now some manufacturers are also choosing electronic load test charging posts. However, during testing, engineers may encounter the following situations.31 2023-10 -
The 8th World Oil and Gas Equipment Expo, Kaixiang Technology in 2E70 booth waiting for your visit!
From October 26 to 28, 2023, the 8th World Oil and Gas Equipment Expo was held in Hainan International Convention and Exhibition Center.26 2023-10 -
Solutions to DC and AC power supply failures
Do not worry when the DC and AC power supplies are faulty. Some small problems can be solved simply by eliminating them. Previously, Xiaobian shared the fault caused by "insulation amplifier" and swing, today specifically said the ground line and ordinary line caused by the problem.21 2023-10 -
Precautions for high power DC power supply discharge test system
Programmable DC power supply High power DC power supply is used for battery discharge test. By setting appropriate load resistance, constant current discharge test can be performed. Here, if the load resistance value is set too low, the reverse voltage will be applied to the DC stable supply and no constant discharge will be possible.17 2023-10 -
Cable kit for high voltage DC power supply
When assembling HVDC power supply wire kits in many workshops, sometimes they don't pay much attention to it. This allows the high voltage DC power supply to be deployed unexpectedly during use, leaving the wires exposed. Such high-voltage DC power supplies are also very prone to failure. Then imagine, if you want to repair a machine, when you open the outer packing board and see a mess of wires, you must want to send the machine straight away, do not want to repair it. This is the function of the high voltage DC power supply wire kit.13 2023-10