Generator AC test electronic load is a good assistant for emergency backup power
Time:2023-07-06
At present, the electronic load as the core of the generator set test system has been widely recognized in the market, the demand is growing rapidly. In general, it is mainly due to the increasing demand for generating units in various industries and the scientific inspection and maintenance of generating units.
Diesel generator used as emergency backup power supply after power failure. On standby most of the time. In case of power failure or power failure, backup diesel generator sets play a vital role. However, we often find problems with the performance of diesel generator sets after power supply failure, which indicates that many users do not pay enough attention to the detection and maintenance of diesel generator sets and knowledge of electronic load.
The load system of the generator set strengthens the daily detection and maintenance of the generator set, establishes a complete test and maintenance procedure for the generator set, and regularizes the maintenance of the generator set regularly, which can effectively avoid the occurrence of power outage accidents and prevent enterprises from suffering unnecessary losses.
Second, regular inspections of generating units can reduce costs. Regular testing of generators can delay the overhaul cycle of original units by 3 to 8 years, and extend the minor repair cycle from the original 12 months to about 18 months, which not only greatly improves the availability of units, but also reduces the maintenance cost.
Advantages of intelligent testing platform for generator sets
1. It can meet the test requirements of multi-voltage and multi-station units, thus eliminating the tedious exchange between users of multiple test equipment;
2.easy to use, save learning costs, improve use efficiency, reduce man-made misoperation;
3.global redundancy design, fully consider the safety of the system under various working conditions;
4.unified maintenance and after-sales, the system can run safely for a long time, extend the effective test time;
5. The system platform has upgradable space, which is convenient for expansion and can solve the unpredictable upgrade problem in the late period.
News Recommendation
-
2024-09-11
TRIUMPH LOAD EXHIBITING AT Enlit Europe 2024 -BOOTH 7.H08
-
2023-04-21
TRIUMPH LOAD EXHIBITING AT DATA CENTER WORLD GERMANY 2023-BOOTH F909
-
2023-04-06
TRIUMPH LOAD EXHIBITING AT ELECTRIC POWER TECH KOREA 2023 – Booth G109
-
2022-05-05
What is the role of ac load bank for power supply?
-
2022-05-05
What is the role of the load bank?